Our situation is that we are a relatively small organization
(AUD$50M of sales) and we have an outdated MRP system.
The current system in Australia has no effective scheduling
ability and is very cumbersome to use for product costings.
We are also in the process of starting up a new facility
in China, which has no MRP system at all, and the people
there have little modern manufacturing experience. We
decided to use it to help get the Chinese operation
up and running quickly first.
The problems we wanted to solve were therefore:
• Provide a scheduling system that allows quick
changes in a very dynamic demand situation
• Provide a quick and easy costing system for
products
• Provide a quick and easy system for materials
requirements planning
• Enable BOMs and Routes to be quickly and easily
built "on the run"
2. Resource Manager was chosen because:
• It is very easy and intuitive to use
• It can be used in sections within days, without
having the whole system implementation required. ie.
the materials planning was done first, then the costings,
then the scheduling
• It is low cost
• It is easily configurable/flexible
• Good support is offered via Skype, phone and
GoToMeeting, with fast turnaround to resolve issues
The biggest benefit relative to other systems looked
at is its simplicity to operate and speed at which it
can generate results in whichever area you want to start
on.
A
whole system can be built up while it is generating
value, which is particularly valuable in a start up
situation such as our Chinese plant.
3.
We considered a number of other systems both local and
global. Most are far more expensive and comprehensive
(eg. accounting capability) but all require much higher
cost and are much more resource hungry to set up. RMDB
required one individual very much part time (me) to
set up on the critical areas for China and is now being
run by a young Chinese manager who had no manufacturing
experience, but has picked up the concepts well. In
that sense it is also a very good MRP training tool
also.
Jim
Steel, Operations Manager for Sleepmaster, LTD