home | products | about us | demos | faq | success stories | press releases | partners
 

(800) 321-USER (8737)
(248) 486-1934


us@usersolutions.com





Please click on the links above to review our full range of solutions.

From a simple Excel Template for Project Management to a fully integrated ‘custom’ add-on that works just right for your scheduling challenges, there is no cost, risk, or obligation in addressing your most pressing challenges.

Contact US today and see your problems going away tomorrow!



Lean Software
Success Stories


Instruments For Industry, Inc (IFI),  is  a leader in the design and manufacture of Solid State and Traveling Wave Tube Amplifiers (both pulsed and CW).   IFI equipment is used successfully in applications all over the world and is the leading supplier of high power transmitters.

IFI has implemented Resource Manager-DB to support a transition to LEAN Manufacturing methods while still maintaining the benefits of traditional MRP applications.   IFI found the combined capabilities provided them unsurpassed flexibility. Review their LEAN Implementation success story, as published by the Long Island Forum for Technology (LIFT) from their site link below.

In a traditional MRP environment, material replenishment is based on a delicate balance of controlled inventory levels and scheduled demands against that inventory. Naturally there are considerable efforts and controls that are required to maintain the integrity of the inventory and the accuracy of the demand against it. These controls place a heavy burden on an organization and are contrary to LEAN Manufacturing Practices.

In the LEAN World, the MRP system does not function and is not required. The system generated replenishment reorder signal is replaced with a visually triggered reorder signal based on actual consumption of material. Although the organization is now streamlined and operating efficiently, the burden is now placed on the purchasing professionals to procure material from a non-system based replenishment requirement.

Resource Manager LEAN System provides the benefit of a MRP based purchasing system while streamlining the purchasing function. The system generated demand for material procurement is replaced with the visually triggered material demand.


For over 15 years User Solutions, Inc. has been the easy choice for thousands of companies worldwide..

Easy to try
Free trial software and / or detailed walk through demos, combined with a 30 day money back guarantee, ensures quick implementation and success without any risk.

Easy to buy:
All major credit cards, Company PO’s, and checks cheerfully accepted. Download Links and e-mail for instant delivery. Real people to help with phone orders plus CDs and printed manuals shipped within a day.



Easy to use
Familiar, open, Microsoft Office design requires minimal configuration and upkeep. In addition, our technical support is the best you will find anywhere. Hear what other users have to say in our Success Stories section, then Call US to schedule a personalized web demo of Resource Manager-DB and see for yourself!



 

 

 

   
All content © Copyright 2002-2003, User Solutions, Inc. All rights reserved | Problems? Contact Webmaster