|
 |

| Products Operations
Manager: EOQPROD.xls |
|
EOQ
for production lot sizes (EOQPROD)
Alvin
Air Systems in
Alvin
,
Texas
,
produces repair and maintenance items for commercial air
conditioning systems.
Alvin
cannot use the standard EOQ for determining production lot
sizes. One
problem is that the standard EOQ assumes that an order
quantity or lot of material is received all at once.
At
Alvin
, most
production lots take some time to complete and parts are
placed in stock on a daily basis until the run is over.
A related problem is that substantial sales usually
occur before the run is over.
To solve these problems,
Alvin
uses
the modified EOQ model for production lot sizes.
Why? The
EOQ must be larger than maximum investment to account for
sales made during the production run.
|
|
Home
| Products
| Order
| About US |
Demos | FAQ
Success Stories
| Press Releases
| Partners 11009
Tillson Drive, South Lyon, MI, 48178 phone: (248)
486-1934 fax: (248) 486-6376 All
content copyright © 2001, User Solutions, Inc. All rights reserved.
Content reproduction prohibited by law. Site
designed by Rich
Ensley for
User Solutions, Inc. |