Job
sequencing for 3 work stations in series (SKED3A)
SKED3A are designed for flow shops
of 3 work stations arranged in series. Each job receives
exactly the same processing at each station. In such
flow shops, there is no attempt to minimize lateness;
instead, the objective is to minimize the total time
needed to complete a batch of jobs.In both SKED2A
and SKED3A, there may be several alternative optimal
solutions. Depending on how the jobs are sequenced
before running the Ctrl – Shift – J macro,
the worksheet may generate different sequences with
the same makespan.